Sector 03
Marine, Vessels & Conversions
Owner-side and shipyard engineering across the full vessel lifecycle — to 10+ class societies. Newbuild vessel design from concept through class approval, OSV-to-WSV conversions, pre-purchase assessments that deliver measurable cost savings, and life-extension of in-service vessels.
Capabilities
Newbuild Vessel Design
- Concept design — GA, lines plan and parametric studies
- Hull form optimisation and CFD — resistance, propulsion, EEDI/EEXI (OpenFOAM / ANSYS Fluent)
- Class approval packages — ABS, DNV, LR, BV, IRS, NK, KR, BKI, RINA, CCS
- Production engineering — nesting plans and fabrication support drawings
Conversions & Modifications
- OSV → WSV / Walk-to-Work conversion — deckhouse structure, gangway integration
- Barge → Pipe-Lay Barge — and mission-specific modifications
- LNG Carrier → FSRU conversion — naval architecture scope, stability, mooring
- Vessel modification, refit and structural life extension
Stability, Hydrodynamics & Advisory
- Intact and damage stability — IMO IS Code, SOLAS, MARPOL, MODU; deterministic and probabilistic
- Seakeeping and global performance analysis — RAOs, motion criteria, air-gap
- Mooring and DP capability analysis — OCIMF MEG4, IMCA M 166, OrcaFlex
- Pre-purchase and pre-charter condition assessment
Assets we handle
OSVsPSVsAHTSsWSVs / W2W VesselsFPSOs / FSOsFLNGsFSRUsLNG CarriersBargesConstruction VesselsPatrol CraftSurvey VesselsCrew BoatsFerriesDredgers
Active software
Standards & codes
IMO IS CodeSOLASMARPOLIMO MODU CodeOCIMF MEG4IMCA M 166DNV-ST-N001ISO 19901-6IACS CSR
Services in this sector
Sea Fastening & Load-out EngineeringSea-fastening and load-out engineering for cargo, modules and cranes carried on barges and heavy-transport vessels: motion and acceleration criteria, grillage and tie-down design, ballast and load-out sequences, and the calculation package prepared for marine warranty surveyor approvalClass Approval Drawings & Statutory DocumentationClass approval drawings, calculations and statutory documents for newbuilds, conversions and modifications, prepared to the rules of ABS, DNV, LR, BV, IRS, NK, KR, BKI, RINA and CCS and taken through plan approval on the owner’s or yard’s behalfOSV & Vessel Conversion EngineeringConversion engineering for offshore support and work vessels: OSV to well-stimulation vessel, barge to pipe-lay barge, tanker to FSO/FPSO and LNG carrier to FSRUFSRU & LNG Terminal Engineering with Cryogenic PipingEngineering for FSRU conversions and LNG import terminals: regasification and hull interface structure, jetty berthing and mooring analysis, cryogenic piping design and stress analysis to ASME B31.3, and class and IGC Code complianceMooring & Station-keeping AnalysisMooring analysis for spread, jetty, single-point and temporary moorings of FSRUs, FPSOs, barges, jack-ups and construction vessels: quasi-static and dynamic analysis in OrcaFlex and AQWA to DNV-OS-E301, API RP 2SK and OCIMF MEG4, with line, anchor, fairlead and fender loads for the structural designers and the class submission.Stability Booklets, Loading Manuals & Inclining ExperimentsIntact and damage stability booklets, loading manuals and inclining experiment procedures and reports for offshore support vessels, barges, jack-ups and converted units, prepared to the IMO Intact Stability Code, SOLAS and the class rules and taken through class and flag approvalFEED & Detailed Engineering Support for EPC ContractorsEngineering-hour support for EPC, EPCI and fabrication contractors on offshore and marine projects: FEED deliverables, detailed structural, naval and pipeline engineering, 3D modelling in AVEVA E3D and SP3D, production drawings and class or certifier submissionsOwner’s Engineer & Project AdvisoryOwner’s engineer services for vessel owners, operators and developers: specification and tender evaluation, review of the contractor’s or yard’s engineering, class and regulatory liaison, site and yard supervision, and change and claims support through commissioningOffshore & Naval Architecture Engineering Outsourcing from IndiaA dedicated offshore engineering team in Mumbai for consultancies, EPC contractors, design houses and vessel owners in Europe, the Gulf and Asia-Pacific: naval architecture, offshore structural, pipeline and piping engineering delivered under your standards and software, at Indian engineering-hour rates, with a working day that overlaps the Gulf fully and Europe every afternoon.
Projects that prove it
Sea-fastening & load-out — crane on bargeSea-fastening design and load-out engineering for crane transportation on barge — 6 items secured for safe passage.Riser installation — 4 platforms, 16 liftsCrane vessel installation engineering for risers across 4 offshore platforms — vessel selection, installation analysis, and methodology for 16 lifts.Davit installation — 4 × 50 MT davitsStructural engineering for the installation of four 50 MT davits along the port side of an offshore construction vessel.OSV to WSV conversion — Norway, 200 MT steelDetailed engineering for OSV to Well Stimulation Vessel conversion — deckhouse structure, nesting plans, fabrication drawings, 200 MT+ steel engineered.Owner's advisory — vessel selection & PLB conversionStrategic advisory for purchase and conversion of a vessel to Pipe Lay Barge — vessel purchased at a reasonable negotiated price.Vessel pre-purchase survey & inspectionFull vessel condition assessment, thickness gauging, and engineering recommendations — vessel purchased at a 20% discount on asking price.Pipelay vessel upgrade — piggyback pipeline installationTwo-phase engineering to modify an operating pipelay vessel for piggyback pipeline installation — from technical feasibility and modification concept to detailed engineering.Structural review — 5 jackets & topsidesIndependent review of structural deliverables for five offshore jackets and their topsides — design reports, calculations and drawings checked against applicable codes.Conductor installation — Mumbai High, 120+ offshore daysSite supervision and project management for conductor installation at Mumbai High — 120+ offshore days, ONGC post-installation approval secured.

