Conductor installation — Mumbai High, 120+ offshore days
ONGC · 2024 · India
Site supervision and project management for conductor installation at Mumbai High — 120+ offshore days, ONGC post-installation approval secured.
120+ offshore days
Scope of work
Project engineering at site during installation operations
Ensuring installation carried out per approved procedure
Field engineering support and technical reporting
Schedule management and ONGC post-installation approval
Services demonstrated by this project
Lifting & Heavy-Lift EngineeringLift engineering for offshore and yard lifts: rigging design, lift-point and padeye checks, dynamic amplification, crane-vessel and barge stability during the lift, and the lift plan calculations reviewed by class or a marine warranty surveyorTransportation & Installation (T&I) EngineeringTransportation and installation engineering for jackets, topsides, modules, risers and conductors: load-out, transportation, launch or lift, upending, set-down and hook-up analysed as one sequence, with the method statements and calculation notes the marine warranty surveyor reviewsRiser & Conductor Installation EngineeringInstallation engineering for risers and conductors on fixed platforms: clamp and guide design, lift and running procedures, vessel interface, fatigue during installation and the MWS-ready calculation packageOwner’s Engineer & Project AdvisoryOwner’s engineer services for vessel owners, operators and developers: specification and tender evaluation, review of the contractor’s or yard’s engineering, class and regulatory liaison, site and yard supervision, and change and claims support through commissioning
Region