Sector 05
Offshore Wind & Renewables
A target market where our floating, mooring and subsea-cable depth transfers directly into fixed and floating wind. Fixed and floating foundation structures, offshore substation platforms, mooring and station-keeping, inter-array and export cable engineering, and T&I for offshore renewables.
Capabilities
Foundation & Platform Structures
- Fixed wind foundation design — monopile, jacket, gravity base (SACS / ISO 19902)
- Floating wind platform structural design — semi-sub, spar, barge-type
- Offshore substation platform — structural design, topsides integration
- Fatigue analysis — wind-driven cyclic loading, DNV-RP-C203
Mooring & Station-keeping
- Mooring system design for floating wind — catenary and taut-leg (DNVGL-OS-E301)
- Coupled time-domain mooring analysis — OrcaFlex
- Mooring fatigue — line fatigue, shackle and connector checks
- Station-keeping and dynamic positioning interface
Cables & T&I Engineering
- Inter-array and export cable on-bottom stability — and protection engineering
- Cable route engineering — burial and rock-dump design
- Transportation and installation analysis — foundations, cables, substation topsides
- Marine Warranty Survey (MWS) packages — for offshore renewables installations
Assets we handle
MonopilesJacket FoundationsGravity Base StructuresFloating Wind PlatformsOffshore Substation PlatformsInter-array CablesExport CablesMooring Systems
Active software
Standards & codes
DNV-ST-0119IEC 61400-3DNVGL-OS-E301DNV-RP-F105DNV-RP-F109ISO 19902GL OffshoreCIGRE TB 610
Services in this sector
Transportation & Installation (T&I) EngineeringTransportation and installation engineering for jackets, topsides, modules, risers and conductors: load-out, transportation, launch or lift, upending, set-down and hook-up analysed as one sequence, with the method statements and calculation notes the marine warranty surveyor reviewsJacket & Topside Structural DesignStructural design of fixed offshore platforms from FEED to fabrication drawings: jackets, wellhead and process decks, bridges, flare towers, helidecks and secondary steel, analysed for in-place, fatigue, seismic, transportation, launch and lift conditions to API RP 2A and ISO 19902, in SACS and SesamJack-up Site-Specific Assessment (SSA) SupportEngineering support for jack-up site-specific assessments to ISO 19905-1 and SNAME T&R 5-5A: leg penetration and punch-through screening, preload, storm-survival and operating checks, spudcan-footprint interaction and platform proximity, for drilling contractors and operators in ONGC, ADNOC and Aramco shallow-water fields.Offshore Wind Substructure & Installation EngineeringFoundation and installation engineering for fixed and floating offshore wind: monopile and jacket substructure design to DNV-ST-0126 and IEC 61400-3, offshore substation platform structures, floating-platform mooring and station-keeping, and transport, sea-fastening and installation engineering for monopiles, transition pieces and WTIV operations
Projects that prove it
Riser installation — 4 platforms, 16 liftsCrane vessel installation engineering for risers across 4 offshore platforms — vessel selection, installation analysis, and methodology for 16 lifts.Conductor installation — Mumbai High, 120+ offshore daysSite supervision and project management for conductor installation at Mumbai High — 120+ offshore days, ONGC post-installation approval secured.Riser lifting feasibility — 30+ lifts assessedFeasibility assessment of riser installation across multiple candidate vessels — structural analysis and lift methodology for 30+ lifts assessed.Pipelay vessel upgrade — piggyback pipeline installationTwo-phase engineering to modify an operating pipelay vessel for piggyback pipeline installation — from technical feasibility and modification concept to detailed engineering.Structural review — 5 jackets & topsidesIndependent review of structural deliverables for five offshore jackets and their topsides — design reports, calculations and drawings checked against applicable codes.Davit installation — 4 × 50 MT davitsStructural engineering for the installation of four 50 MT davits along the port side of an offshore construction vessel.Jacket face survey — 39 platformsStructural assessment of 39 jacket faces for riser and clamp installation — ONGC-approved hand sketches, drawings, and survey reports.Sea-fastening & load-out — crane on bargeSea-fastening design and load-out engineering for crane transportation on barge — 6 items secured for safe passage.