From metocean to member loads
A mooring analysis is only useful if its outputs reach the people who need them: the structural designer needs fairlead and foundation loads, the terminal designer needs fender and bollard loads, the operator needs a limiting-sea-state table. Our reports are organised around those hand-offs, and the same team designs the fairlead foundations and the jetty structures when the client wants one interface.

