One sequence, not separate calculations
T&I fails at the interfaces: a jacket designed for its in-place loads but not for the launch, a topside lifted with padeyes sized for a different crane, a riser clamp that meets the platform but not the installation vessel’s reach. We engineer the sequence end to end so every temporary condition is analysed with the same weight report and the same criteria, and the method statement matches the calculations the MWS approves.

