The engineering-support route into Gulf projects
Direct registration with the national oil companies requires a local entity: Saudi Aramco needs a MISA-licensed Saudi company and IKTVA, ADNOC needs SAP Ariba pre-qualification and an ICV certificate, and QatarEnergy and PDO run their own supplier programmes. We therefore work for the EPC, T&I and fabrication contractors who hold those registrations — jacket and topside design support, transportation and installation engineering, production drawings and class approval — and we say so plainly rather than promising a route we cannot deliver.
For owners and operators the direct scopes are third-party design review, structural integrity assessment and jack-up site-specific assessment support, which are engineering deliverables rather than registered contractor services.

